GeoFoundation Geotechnical Consultant Inc.
Typical Projects
Highrise Building/Temporary Shoring
-
Fresco High-Rise, Rosser Avenue and Lougheed Highway, Burnaby, BC
-
Newport Village Phases 5, 6, and 7, 290 Newport Drive, Port Moody, BC
-
Residential High-Rise Complex, 950 Québec Street, Vancouver, BC
-
High-Rise, 720 Hamilton Street, New Westminster, BC
-
Mid-Rise Complex, 663 Gore Avenue, Vancouver, BC
-
High-Rise Complex, Holdom Street and Lougheed Highway, Burnaby, BC
Subdivision/Multi-family
-
Townhouse, 2115 Prairie Avenue, Port Coquitlam, BC
-
Albert Head Cadet Summer Training Centre, Esquimalt, BC
-
Chevron Gasoline Tank Settlement Mitigation, Surrey, BC
-
Town of High River – Emergency Flood Mitigation Upgrades, High River, AB
-
170 Residential House at East 19th Avenue Vancouver, BC
-
Residential Building at 5202 Cecil Ridge Place, Chilliwack, BC
-
Retaining wall at 6619 Nelson Avenue, West Vancouver, BC
-
Foundation Underpinning- 2663 West 21st Avenue, Vancouver, BC
-
Foundation Underpinning- 2127 West 21st Avenue, Vancouver, BC
Institutional/Highway and Bridge/Retaining wall
-
Seymour Mountain Water Pipe (GVWD), North Vancouver, BC:
-
Six Mile Value Engineering (No. 1 Highway) Project, Kicking Horse River, BC:
-
Coquihalla Bridge, Hope, BC:
-
Cariboo Highway (No. 97) Upgrade, Williams Lake, BC
-
Cleveland Dam Monitoring North, Vancouver, BC
-
Port Mann Bridge and Highway No. 1 – Burnaby to Coquitlam, BC
-
Town of High River – Emergency Flood Mitigation Upgrades, High River, AB
-
Town of High River – Temporary Dike for Emergency Flood, Calgary, AB
Industrial/Commercial
-
Pump Station, 6th Avenue and Oak Street, Vancouver, BC
-
Hyde Creek Storm Water Diversion Sewer, Vancouver, BC
-
Nam Theun Hydroelectric Power Station, Lao, Asia
-
Site Assessment for Enbridge Tank Field Project, Kitimat, BC
-
Mini Pile Foundation for Ski Jump – 2010 Olympic Game Project, Whistler, BC
-
Vancouver International Airport Taxiway J Relocation, Apron VI Expansion and De-icing Pad, Richmond, BC
-
Celgar Energy Project, Castlegar, BC
-
Kitimat Modernization, Kitimat, BC
-
Oakland Bay Self-Anchored Suspension Span, San Francisco, California, USA
-
Puget Sound Propane Export Facility, Cherry Point, Washington State, USA
-
Atomic Energy of Canada Limited (AECL) – Sheet Pile Retaining Wall, Mississauga, ON
-
Spoil Management for Aurora LNG Pre-feasibility Study, Digby Island, BC
-
Melted Iron Pit Excavation Project, Baosan, Shanghai, China
-
Wallenius Wilhelmsen Logistic (WWL) Terminal Upgrade, Port Metro Vancouver, BC
Wharf
-
Deltaport Berth No. 3 Marine Works, Delta, BC
-
CMSA Container Terminal Project, Manzanillo, Mexico
-
Ruwais 4th NGL Train Project, Abu Dhabi
-
Pangnirtung Harbour Development – Sheet Pile Design, NU
-
Aguadulce Port Facility, Buenavetura, Colombia
-
Blue Water Terminal, Vancouver, BC
-
Woodfibre LNG Terminal Pre-FEED Study, Woodfibre, BC
-
Little Narrow Gypsum Company Wharf Facility, Bras d’Or Lake, NS
-
Kinder Morgan Canada Terminals Limited Partnership, Vancouver
-
Derrick Equipment Set (DES)/Drilling Support Module (DEM) – Hebron Topsides Project, St. John’s, NL
-
Westshore Terminals Limited Partnership – PS24 Dumper Upgrade, Delta, BC
-
Sarnia Shell LNG Terminal, Sarnia, ON
-
Squamish Berth 1 Terminal Rebuilt, Port Metro Vancouver, BC
-
Iqaluit Gravity Wharf , Nunavut Government, Iqaluit Nunavut
-
Black Ball Ferry Terminal, Victoria, BC
-
Alliance Grain Terminal Project, Downtown Vancouver, BC
-
RVYC Jericho Project, Downtown Vancouver, BC
BC Ferry/MOT Terminal
-
Little River Berth Replacement, Comox, BC
-
Glade Terminal Update, Kootenay, BC
-
Sointula Ferry Terminal – Pile Foundation, Victoria, BC
-
Long Harbour Terminal Update , BC Ferry Terminal, BC
-
Port of Ocean Falls and Bella Coola Update , BC Ferry Terminal, BC
-
Port of Rupert Terminal Update , BC Ferry Terminal, BC
Earthquake Engineering
-
Seismic Review for Mayo Dam, Mayo, YT
-
Syncrude Boundary Dyke Seismic Stability Study, Mildred Lake Fort MacKay, AB
-
Rocky Point Jetty Seismic Upgrade, Pedder Bay, BC
-
Domtar North Vancouver Shipyard Remediation Project, North Vancouver, BC
-
RTA Terminal, Kitimat, BC
-
LNG Canada Plant, Kitimat, BC
-
Pond Inlet Gravity Wharf , Nunavut Government, Pond Inlet Nunavut
Mining Projects
-
Cross Lake Mineral Ltd. – Cross Dyke and Tailings Dam for QR Mine Facility, Quesnel, BC
-
Pacific Booker Mineral Inc. – Morrison Lake Copper Project, Morrison Lake, BC
-
Carmacks Mine – Heap Leach Pad Design, Whitehorse, YT
-
Albian Sands – Muskeg River Mine, Fort McMurray, BC
-
Cominco Copper Mine-Highland Valley Copper Project, Logan Lake, BC
-
Shark Bite Mine Project, Fort McMurray, AB
-
Muskeg River Mine Project, Fort McMurray, AB
-
Roman Mountain – Peace River Coal Operations, Tumbler Ridge, BC:
-
TransAlta Highvale Mine Project, Lake Wabamun, Edmonton, AB
-
Willow Creek Western Coal Corp., Chetwynd, BC
-
Chevron Questa Molybdenum Mine Project, Taos County, New Mexico, USA
-
Efemcukuru Mine – Eldorado Gold Mine Project, Izmir Province, Turkey
-
Ovoot Tolgoi Coal Mine- Open Pit project, South Gobi of Mongolian
-
Black Iron – Shymanivske Feasibility Study, Shymanivsky, Ukraine
-
Sediment Pond (SP5 and SP6) Project, Peace River, BC
Dam Safety Review/Forensic Investigation
-
Huldra Mine Dam Safety Inspection Report Review, Merritt, BC
-
Dam Safety Review for Long Lake Hydro Dam, Stewart, BC
-
Forensic Investigation for Excessive Settlement – Suncor SPT Project, Fort McMurray, AB